We recently completed a full roof replacement for a lovely property in Higham, Kent, and this one really shows what a difference a brand-new roof can make. With the help of some epic drone shots, you can clearly see the scale of the job and the precision involved from start to finish.
Project Overview
The existing roof had reached the end of its lifespan, with tired tiles, worn-out battens, and failing underlay. Our team carried out a complete strip-off before rebuilding the entire roofing structure with modern, durable materials designed to protect the home for decades to come.
Step-by-Step Process
1. Full Roof Strip-Off
We began by removing all existing tiles, ridge tiles, and old battens. This exposes the roof rafters and gives us a clean, safe foundation to work from. All waste materials were safely lowered and disposed of responsibly.
2. Roof Deck Inspection & Repairs
Once stripped, we inspected every section of the timber structure. Any weakened or weathered rafters were repaired or reinforced to ensure the new roof sits on a solid, long-lasting frame.
3. Installation of New Breathable Membrane
We then laid a high-performance breathable roofing membrane, fixed neatly across the entire roof area. This membrane is essential for preventing water ingress while still allowing ventilation, helping to avoid long-term issues like damp and condensation.
4. Fixing New Treated Battens
Treated roofing battens were measured, spaced, and securely fixed, creating perfectly level guidelines for the tile installation. Precision here ensures the finished roof looks flawless and performs exactly as it should.
5. Tile Installation
With the prep complete, we began laying the new roof tiles. The images show our team working methodically from the bottom upward, ensuring every tile is clipped, fixed, and aligned correctly.
The new tiles chosen for this property offer:
A rich, modern colour blend
Excellent durability
Strong wind, rain, and frost resistance
They instantly transformed the look of the home.
6. Chimney Detailing & Leadwork
We carried out essential chimney work, including:
Rebuilding the surrounding area
Installing new lead flashings
Ensuring a fully watertight seal
Two roof windows were also carefully unseated and reinstated during the membrane and battening stage to maintain full waterproofing.
7. Final Touches
The finishing stage included:
Installing ridge tiles
Tidying all edges, verges, and valleys
Cleaning the site
A full aerial inspection to ensure the roof was perfect from every angle